## Summary

PAGE 01 · OVERVIEW Key sections include: Supply Chain; Global trade; Container TEUs; Inventory cost; Port cluster; Five Stages, End to End; The Box That Changed Everything; Top 10 ports by TEU · 2024; Inventory: The Buffer; ABC analysis (Pareto).

## Slide Outline

1. Supply Chain
2. Global trade
3. Container TEUs
4. Inventory cost
5. Port cluster
6. Five Stages, End to End
7. The Box That Changed Everything
8. Top 10 ports by TEU · 2024
9. Inventory: The Buffer
10. ABC analysis (Pareto)
11. Turnover
12. Just-in-Time · The Toyota Way
13. Two pillars
14. The seven wastes (Muda)
15. Kanban
16. Kaizen
17. The fragility tradeoff
18. The Bullwhip Effect
19. Modes & Movement
20. Last mile
21. 3PL / 4PL
22. Incoterms
23. Case · The Ever Given · 2021
24. Other choke points
25. Case · The 2020-22 Squeeze
26. Resilience: Beyond Efficiency
27. The classic tradeoff
28. Risk heatmap
29. The Metrics That Matter
30. OTIF
31. Fill Rate
32. DOI
33. Cash Conversion Cycle
34. Perfect Order
35. Forecast Accuracy
36. Supplier OTD
37. Carbon (Scope 3)
38. The Common Mistakes
39. Reading & Watching
40. Logout · End of Shift

## Slide Transcript

### Slide 1: Supply Chain

- PAGE 01 · OVERVIEW
- The discipline of moving inputs to outputs to customers — predictably, profitably, and at speed. From Henry Ford's River Rouge to Amazon's anticipatory shipping; from the standardized container to the Suez Canal blockage of 2021.
- Global trade
- $32T+3.1%
- Goods + services 2024 (WTO)
- Container TEUs
- 170M+2.4%
- Global throughput annual
- Inventory cost
- 25%+ in 2024
- Of inventory value · annual carrying
- Port cluster
- Top 10 = 60% of global TEUs
- Illustrative placeholder port image (picsum.photos) · Port of Singapore handles ~38M TEUs/yr
- What the supply chain is
- The set of organizations, people, activities, information, and resources involved in moving a product or service from supplier to customer.
- Five flows simultaneously: PRODUCT INFORMATION CASH RIGHTS RISK
- "There is no such thing as a free lunch — and there is no such thing as a free supply chain." — Hau Lee, Stanford

### Slide 2: Five Stages, End to End

- PAGE 02 · THE FLOW
- Plan
- Demand forecasting, inventory targets, S&OP cadence.
- Source
- Supplier selection, contracts, RFQs, multi-sourcing.
- Make
- Production scheduling, QA, capacity planning.
- Deliver
- Order fulfillment, warehousing, transportation.
- Return
- Reverse logistics — defects, recalls, recycling.
- Enable
- People, data, processes, governance — the SCOR sixth pillar.

### Slide 3: The Box That Changed Everything

- PAGE 03 · CONTAINER REVOLUTION
- April 26, 1956. Malcolm McLean, a North Carolina trucker, watches his 58 truck-trailer-sized containers being lifted by crane onto the modified tanker SS Ideal X. Newark to Houston. The shipping cost dropped from $5.86/ton (loose freight) to $0.16/ton. A 36× reduction.
- Standardized containers (20-foot, 40-foot · TEU/FEU), interchangeable by ship/rail/truck, eliminated the labor of port stevedores reloading goods piece by piece. World trade as a share of GDP doubled by 1990 and tripled by 2010 — Marc Levinson's The Box argues containerization is half the explanation.
- By the numbers
- ~25M containers in circulation (2024)
- ~5,400 container ships globally
- 24,000+ TEU capacity on largest (HMM Algeciras class)
- ~$30B in damaged or lost-overboard cargo annually
- Top 10 ports by TEU · 2024
- RankPortTEUs (M)
- 1Shanghai · CN49.2
- 2Singapore37.3
- 3Ningbo-Zhoushan · CN36.0
- 4Shenzhen · CN30.0
- 5Qingdao · CN28.7
- 6Guangzhou · CN25.4
- 7Busan · KR23.2
- 8Tianjin · CN22.0
- 9Hong Kong14.4
- 10Rotterdam · NL14.4
- —L.A. + Long Beach (US #1)17.3

### Slide 4: Inventory: The Buffer

- PAGE 04 · INVENTORY
- Inventory absorbs the mismatch between supply and demand timing. Too little = stockouts. Too much = capital tied up, obsolescence, storage cost (~25%/yr of value).
- Cycle stock
- Reordered routinely. EOQ formula: Q* = √(2DS/H) where D=demand, S=order cost, H=holding cost.
- Safety stock
- Buffer for demand variability. SS = z·σ·√L (z=service-level, σ=demand SD, L=lead time).
- Pipeline
- In transit. Average inventory in pipeline = lead-time demand. Long lead = lots of capital afloat.
- ABC analysis (Pareto)
- Class% items% revenuePolicy
- A~20%~80%Tight control · daily counts
- B~30%~15%Moderate · weekly
- C~50%~5%Loose · monthly · large reorder
- Turnover
- Inventory turns = COGS ÷ avg inventory. Higher = more efficient.
- IndustryTurns/yr
- Grocery14–18
- Fast fashion (Zara)10–14
- Auto OEMs8–12
- Apple~38 (best in class)
- Industrial machinery3–5
- Luxury watches1–2

### Slide 5: Just-in-Time · The Toyota Way

- PAGE 05 · TOYOTA
- Postwar Japan, capital-starved. Taiichi Ohno (1912-1990) at Toyota develops the production system later codified by Womack & Jones as Lean Manufacturing.
- Two pillars
- Just-in-Time (JIT) — produce only what is needed, when needed, in the quantity needed. Pull, not push.
- Jidoka (autonomation) — automation with a human touch. Any worker can pull the andon cord to stop the line on a defect.
- The seven wastes (Muda)
- Transportation · unnecessary movement of material
- Inventory · materials waiting
- Motion · workers moving more than needed
- Waiting · idle time
- Over-production · making more than needed
- Over-processing · features customers don't value
- Defects · rework, scrap
- Kanban
- The signaling card — literally a paper card moved between stations to authorize work. Modern variants: digital Kanban boards, electronic kanban (eKanban), VMI (vendor-managed inventory).
- Kaizen
- Continuous, incremental improvement. Workers — not consultants — propose changes. Toyota implements ~1M employee suggestions a year (~80% adopted).
- "Costs do not exist to be calculated. Costs exist to be reduced." — Taiichi Ohno
- The fragility tradeoff
- JIT minimizes inventory cost but maximizes exposure to disruption. March 2011: Tōhoku earthquake/tsunami knocks out Renesas (a key Toyota chip supplier). Production drops by ~800,000 vehicles globally. March 2021: Renesas fire. Same problem, different decade. Toyota subsequently built ~6 months of chip stock — abandoning pure JIT for the most critical components.

### Slide 6: The Bullwhip Effect

- PAGE 06 · BULLWHIP
- Hau Lee, Stanford 1997. Small variations in end-customer demand amplify upstream into wild swings in supplier orders. The villain: each tier reacts to its own visible demand without seeing the chain.
- Five drivers
- Demand-signal processing — overreacting to recent data
- Order batching — placing big orders periodically rather than continuously
- Price fluctuations — promotional buys distort demand
- Rationing/shortage gaming — over-ordering to claim scarce supply
- Lead-time variability — long lead times widen forecast windows
- Counter-measures
- Share point-of-sale data with all tiers (CPFR)
- Reduce lead times — JIT, near-shoring
- Smaller, more frequent orders
- Everyday-low pricing instead of promotional bursts
- Vendor-managed inventory (Walmart-P&G pilot, 1988)

### Slide 7: Modes & Movement

- PAGE 07 · LOGISTICS
- ModeCost ($/ton-mi)Speed% of US ton-miBest for
- Pipeline~0.02Continuous17%Oil, gas, slurry
- Water (barge)~0.04Slowest5%Bulk commodities (grain, coal)
- Rail~0.04Slow28%Long-haul bulk, intermodal
- Truck~0.20Medium42%Door-to-door, time-sensitive
- Air~0.80Fastest<1% (but ~30% of value)High-value, perishable, urgent
- Last mile
- The most expensive segment per kilometer. Up to 50% of total parcel logistics cost. Drone delivery, autonomous vehicles, locker networks, and dark stores all chase the same cost curve.
- 3PL / 4PL
- Third-party logistics outsources execution (warehousing, freight). Fourth-party manages the entire network including other 3PLs. DHL, Maersk Logistics, Kuehne+Nagel are top global 3PLs.
- Incoterms
- 11 standardized contract terms governing who bears cost/risk where. The most common:
- TermRisk transfers
- EXWBuyer at seller's factory
- FOBOnce on board the vessel
- CIFSeller pays freight + insurance to port
- DAPDelivered at place
- DDPSeller pays everything to door

### Slide 8: Case · The Ever Given · 2021

- PAGE 08 · CASE: SUEZ
- Mar 23, 2021, 07:40 local. The 400m-long, 220k-ton container ship Ever Given grounds itself diagonally across the Suez Canal during a sandstorm. A 6-day jam ensues. ~370 ships pile up.
- Suez carries ~12% of global trade and ~30% of container traffic. Lloyd's estimated $9.6B/day in trade was held up. Toilet-paper futures briefly spiked.
- Refloating: 14 tugboats, 2 dredgers, the spring tide. Freed Mar 29 at 15:05.
- Lessons retroactively absorbed
- Single-route concentration is fragile
- Cape of Good Hope rerouting adds ~10 days, ~$300k fuel per ship
- "Black swan" was actually a known risk · Suez had been blocked before (1956, 1967, 2004)
- Companies rebuilt risk registers and resilience plans
- Illustrative placeholder canal image (picsum.photos) · Suez Canal sees ~50 ships transit per day in normal ops
- Other choke points
- Point% world oil
- Strait of Hormuz~20%
- Strait of Malacca~25% trade
- Bab-el-Mandeb (Red Sea)~12% (Houthi attacks 2023-24)
- Panama Canal~5% (drought 2023-24)

### Slide 9: Case · The 2020-22 Squeeze

- PAGE 09 · CASE: COVID
- Pandemic shutdowns cratered Q1 2020 demand → orders cancelled → 2H demand surged for goods (not services) → ports overwhelmed → ships waited weeks at LA/LB → factories couldn't ship → semiconductor shortage cascaded into auto, electronics, appliances. The single largest supply-chain stress test of the modern era.
- The numbers
- Shanghai-LA freight: $1,500 → $20,000 per FEU (peak Sep 2021)
- Anchorage queue at LA: 109 ships waiting (Jan 2022)
- Auto industry lost ~10M units production due to chips
- Ford profits down ~50% Q1 2022 from chip impact alone
- Why chips
- Auto orders cancelled spring 2020. TSMC reallocated capacity to consumer electronics (PCs, phones — booming WFH demand). When auto rebounded, no slots left.
- Lead times for some chips ran 50+ weeks through 2022.
- The reset
- Reshoring, friend-shoring, China+1. CHIPS Act 2022 ($52B U.S. fab subsidy). India and Vietnam gain export share.
- By Q4 2023, freight rates back at $1,500/FEU. The cycle turned.

### Slide 10: Resilience: Beyond Efficiency

- PAGE 10 · RESILIENCE
- The classic tradeoff
- Optimizing for cost (fewer suppliers, lower inventory, longer routes) maximizes efficiency. Optimizing for resilience (multiple sources, buffers, shorter routes) maximizes survivability. The 2020s have rewritten the optimum.
- Levers
- Multi-sourcing — at least two qualified suppliers per critical part
- Geographic diversification — no >30% single-country exposure
- Strategic stockpiling — months of safety stock on bottleneck inputs
- Visibility — tier-2 and tier-3 mapping (Apple maps tier-4 for cobalt)
- Substitutability — design products with alternative materials
- Financial hedging — supplier financing, credit insurance
- Risk heatmap
- SKU × supplier risk · 12 weeks forward
- Stress tests
- Simulate: a typhoon hits Taiwan; the Strait of Hormuz closes; a tier-2 supplier files Chapter 11. What's the customer impact in 30/60/90 days?

### Slide 11: The Metrics That Matter

- PAGE 11 · METRICS
- OTIF
- On-Time, In-Full. Industry benchmarks 90–95%. Walmart targets 98% from suppliers; charges fines below.
- Fill Rate
- % of customer demand met from stock. SKU-level metric. 95%+ for retail FMCG.
- DOI
- Days of Inventory. Stock ÷ daily COGS. Apple ~9 days. Costco ~30 days. Boeing parts ~250 days.
- Cash Conversion Cycle
- DIO + DSO − DPO. How long cash is tied up. Negative CCC (Amazon: ~−30 days) means suppliers fund growth.
- Perfect Order
- On-time, complete, undamaged, accurately invoiced. ~80% of orders qualify in best-in-class retail.
- Forecast Accuracy
- 1 − MAPE. SKU-level forecasts >70% are great; aggregate forecasts often >90%.
- Supplier OTD
- On-time delivery from suppliers. Below 95% triggers QBR escalation in most procurement orgs.
- Carbon (Scope 3)
- Most companies' biggest emissions are upstream. Walmart's Project Gigaton: 1B tons CO₂e cut by 2030.

### Slide 12: The Common Mistakes

- PAGE 12 · MISTAKES
- Optimizing one stage in isolation. Local optima do not aggregate to global optimum.
- Buying volume discounts that exceed inventory carrying cost.
- Sole-sourcing critical inputs to save 3% — losing 30% of revenue when the supplier fails.
- Ignoring tier-2 and tier-3 visibility. Your "diverse" supplier base may all depend on one Taiwanese fab.
- Confusing low cost with low total cost of ownership (TCO).
- Building a forecast based on shipments instead of consumer demand. Bullwhip in waiting.
- Treating safety stock as fixed; it should scale with √(lead time).
- Promising 99.9% service level on 100% of SKUs — cost is exponential past 95%.
- Using transportation modes by habit. Air can be cheaper than ocean once inventory cost is included.
- Treating sustainability as a side project. Customers, regulators, and capital all now price it in.

### Slide 13: Reading & Watching

- PAGE 13 · READING
- Books
- Levinson — The Box
- Womack, Jones & Roos — The Machine That Changed the World
- Ohno — Toyota Production System
- Goldratt — The Goal (theory of constraints, novel form)
- Liker — The Toyota Way
- Sheffi — The Resilient Enterprise
- Christopher — Logistics & Supply Chain Management
- Simchi-Levi — Designing & Managing the Supply Chain
- YouTube
- CNBC — supply-chain documentaries
- Bloomberg — port + freight market coverage
- Wendover Productions — logistics deep dives (containers, FedEx, etc.)
- What's Going On With Shipping — Sal Mercogliano · the daily shipping briefing
- Stanford GSB — Hau Lee, supply chain management
- Data sources
- WTO Statistics · BTS.gov · UNCTAD · Drewry Shipping · Freightos · Bloomberg Container Index

### Slide 14: Logout · End of Shift

- PAGE 14 · END
- "In supply chain, you are only as strong as your weakest tier." — attributed across the discipline
- Fourteen pages of dashboards. The control tower closes for the day. The boxes keep moving — 24/7, 365 — across 5,400 ships, 2.5 million trucks, half a million planes, and the tens of millions of warehouse bays in between. Every flat-pack shelf you've ever bought is the legible tip of an invisible system.
- $ logout
- ← The Deck Catalog · Business & Economics index · Vol. VII · Deck 08 · Supply Chain


## Related Decks

- [Supply Chain Management](https://shipslides.com/d/business-supply-chain-management)
- [Accounting](https://shipslides.com/d/business-accounting)
- [Stock Market Basics](https://shipslides.com/d/business-stock-market-basics)
- [Advertising History](https://shipslides.com/d/business-advertising-history)